Skip to Main Content
Software Ideas

Welcome to the Boise Cascade Engineered Wood Products Software Ideas Portal! 

We welcome your EWP Software suggestions and ideas.

ADD A NEW IDEA

BC Connect

Showing 54 of 208

Inventory Usage - History View

Problem Context: The current inventory usage report only allows me to see the past two months worth of data. This prevents me from tracking how much of a product or how many products i ran through processing. Idea: Add an additional tab to the rep...
4 months ago in BC Connect 0

System "Notification" Banner

Problem Context The current system banner does not distinguish between informational messages and alerts that users need to be aware of when an outage or performance impact has been detected. This leads to confusion, both from the system admin and...
5 months ago in BC Connect 0 Tracked

User Defined Landing Pages

Problem Context: Users are not able to select a specific page that they always want to start at when logging in. This leads to additional effort to navigate to that page before starting work. Idea: Provide the ability for users to directly access ...
5 months ago in BC Connect 0

Activity Log

Problem Context: The activity log lacks sufficient information to provide a comprehensive understanding of project events. There are several important actions that are not currently logged, and there is no capability to search for specific records...
5 months ago in BC Connect 0 Tracked

Notifications

Problem Context: The current notification system is cumbersome to use and the information provided is lacking in clarity for identifying action items. The settings do not allow the user clear control over what/when they get notifications or what t...
5 months ago in BC Connect 0 Tracked

Wasted Space on UI

Problem Context: The Top Nav and page metadata areas occupy a significant amount of space, pushing down the important content on the page. As a result, users have to scroll a lot and struggle to view the critical project data that needs to be revi...
5 months ago in BC Connect 0 Tracked

"RFO" Save Process

Problem Context: I have been working with BC Connect for quite a while. Every time I click to set a material list to "Ready for Optimization," I have to click through a prompt reminding me that I am going to lock the list. Since I am comfortable w...
5 months ago in BC Connect 0

Multiple Saved Dashboard Views, Excel Download of Dashboard View, Dashboard Visibility on Large Screens

Having the option to save the Dashboard with multiple column and filter settings would allow users to quickly view projects as required. For instance, saving a dashboard of projects where I am the Sales Contact or Designer vs all Preliminary proje...
about 6 years ago in BC Connect / Project Dashboard 1 Already Exists

Multiple Item Filtering

It would be helpful to be able to filter out stuff you do not want to see. If we do not want to see designs that are Complete and/or Waiting on Information you cannot filter both of these not to show. Currently, we only have a filter for a single ...
almost 6 years ago in BC Connect / Design / Project Dashboard 1 Already Exists

Filter Dashboard by N/A

As a user I would like to be able to filter my Dashboard view by N/A values. For instance if I only want to view new projects that have not yet moved into a quote/design/etc status, I am unable to change the Status dropdown to display only those i...
about 6 years ago in BC Connect / Project Dashboard 1 Already Exists