Skip to Main Content
Software Ideas

Welcome to the Boise Cascade Engineered Wood Products Software Ideas Portal! 

We welcome your EWP Software suggestions and ideas.

ADD A NEW IDEA

All ideas

Showing 8

Reporting

As a BC CONNECT user, i would like the ability to view reports within in the application.
over 6 years ago in BC Connect 0 Shipped

Project Collaboration and Sharing

As a BC CONNECT user, i would like the ability to share a project with one or many locations in order to distribute the workload.
over 6 years ago in BC Connect / Other / Projects 0 Shipped

An option in BC Connect to filter by “Designer” using the value of N/A so I can filter down to see just jobs no one has started yet?

When the Project Dashboard gets loaded up, from the standpoint of a design manager, it's necessary to be able to easily filter down to see what jobs have not been picked up by a designer yet. There are other ways to narrow it down, but they requir...
over 4 years ago in BC Connect / Design Management / Project Dashboard 1 Shipped

Edit capability of xml files from BCFramer OR allow single floor import into Agility

Before importing a xml file into Agility, I would like to have the ability to edit(add/delete) some of the materials. Customers do not always order the whole floor at once wanting the second floor at a later time. With this I could delete the mate...
almost 6 years ago in BC Connect 0 Shipped

Notification Of System Outage

From Customer Feedback It would be nice if you could be notified if there is an System outage in BCConnect instead of having to make numerous phone calls. A banner across the top with the information that we receive when there is a scheduled o...
about 6 years ago in BC Connect 1 Shipped

Limit the list of products shown in Manage Inventory Quantities to those products we actually stock.

Modifying the inventory quantities requires many extra clicks getting past the products that are not stocked to the ones we want to modify.
about 6 years ago in BC Connect 0 Shipped

Add the dealer contact name to the project Customer Info. Make it searchable.

The customer said that the dealer contact may be the only person who know about this project. Right now they are using a builder name for the contact but it is really a contact name at the Dealer. Show dealer name and Dealer contact name and make ...
about 6 years ago in BC Connect 2 Shipped

Activity Log

As a BC CONNECT user, i would like to have the ability to track actions that have been applied to a project.
over 6 years ago in BC Connect 0 Shipped