Skip to Main Content
Software Ideas

Welcome to the Boise Cascade Engineered Wood Products Software Ideas Portal! 

We welcome your EWP Software suggestions and ideas.

ADD A NEW IDEA

All ideas

Showing 41

Upload project attachments at Project Create

Problem Context When I am creating a new project, I have to create the project completely so that I can navigate to the attachments tab before I can upload any attachments. Idea Allow project attachments to be uploaded as the project is being crea...
10 months ago in BC Connect 0 Tracked

Project Template

Problem Context When i create a project, i have a lot of information that i need to add manually, depending on project type. This is time consuming, and it would be nice to have it automated. Idea Allow a project starting point to be defined so th...
10 months ago in BC Connect 0 Tracked

Custom Project Number

Problem Context When a project starts in an "outside" application, i need to match my BC Connect project numbers to the outside application number. I am currently unable to do this, so it can create confusion when i use other fields to track the p...
10 months ago in BC Connect 0 Tracked

Blocking - Move Pull and Ship pieces back out into cut solution

Problem Context When the system identifies blocking pieces in the material list to handle as Pull and Ship, i am unable to move any of that original amount back out in the solution to be included in cuts. Idea Allow these pull and ship pieces to b...
11 months ago in BC Connect 0 Tracked

Create builder - Auto recommend when already exists

Problem Context There are times when I miss that a particular build has already been added to the system when assigning builder to a project. When this happens, a duplicate of that builder is created. This causes issues since there are now two ver...
11 months ago in BC Connect 0 Tracked

Create BCML Design Model

Problem Context Extend the ways locations can setup Design Model Repos by supporting converting existing BCMLs into Design Models. Idea Enable users to take an existing BCML and convert it into a Design Model for use with the Tract Projects feature.
11 months ago in BC Connect 0 Tracked

Configure auto-calculation of Sq/ft of Framing

Problem Context Following the change to allow the system to provide a calculated value for "Sq/ft of Framing", give users more control over which DSTs are included in the sum for "Sq/ft of Framing". Idea The user can manage which associated DSTs a...
11 months ago in BC Connect 0 Tracked

Configure auto-calculation of Actual Designer Time

Problem Context Following the change to allow the system to provide a calculated value for "Actual Designer Time", give users more control over which DSTs are included in the sum for "Actual Designer Time". Idea The user can manage which associate...
11 months ago in BC Connect 0 Tracked

Update Project Status when all Actual dates are populated

Problem Context Having the system automatically set the field based on certain triggers could help reduce the need for users to manually manage the Project Status field. Idea When the user changes any of the Actual dates on the Project Edit page U...
11 months ago in BC Connect 0 Tracked

Update Project Status based on Design Work Status

Problem Context Automating updates to keep Project Status in sync with the Design Work Status could help users not need to manually manage multiple statuses. Idea When an update to Design Work Status is made from the Project Edit page UI, the Desi...
11 months ago in BC Connect 0 Tracked