Skip to Main Content
Software Ideas

Welcome to the Boise Cascade Engineered Wood Products Software Ideas Portal! 

We welcome your EWP Software suggestions and ideas.

ADD A NEW IDEA

BC Connect

Showing 63 of 234

Edit Design Model Material List

Problem Context There currently isn't a process to edit the material list assigned to a Tract project design model. The design model must be deleted and a new one created for any material list changes. Idea Allow the material list to be edited in ...
19 days ago in BC Connect 0 Tracked

Preview Design Model Material list

Problem Context I am not able to see the material list attached to a design model until i create a project with it. It would be nice to have the ability to see the material list to ensure it is the correct one prior to project creation. Idea Provi...
19 days ago in BC Connect 0 Tracked

Operations Print Configuration

Problem Context There are times that i have different information as part of the project or material list that i would like to have included in the print that is applied to the cut items. There is not a way to configure this change. Idea Provide a...
20 days ago in BC Connect / Operations - Optimization 0 Tracked

Operations Print Preview

Problem Context I don't always know what information will be printed on a board, the order it will be printed in, or if the board length will support the full length of the label. Idea Provide information in the current hover over text to identify...
20 days ago in BC Connect / Operations - Optimization 0 Tracked

Cutting Off-cut to different size

Problem Context We have a large off cut piece from a optimization, (ie 40' piece) and for easier handling would like to be able to have them cut into frequently used inventory lengths ( ie 2- 20' Idea
24 days ago in BC Connect / Operations / Operations - Optimization 0 Tracked

Adding material weight attributes for EWP products to show up in material reporting

requested by Brent Simmons on the BC Estimator idea portal If a weight attribute could be added to a product, either under usages or within the Database tab, and that could show up just like the $ or sku does on our current material reports, this ...
4 months ago in BC Connect 0

Project Delete

Problem Context Users report frustration that they are unable to delete projects. Users do not fully embrace that projects can be repurposed or there is greater emphasis on created date than repurposing would support. Users want to remove projects...
10 months ago in BC Connect 0 Tracked

Allow free input for Project Sales Contact in addition to the drop-down list.

Problem Context The sales list is limited to invited users. This is a process requiring invites, multiple emails and registration. Idea Open the Sales contact field to allow manually input.
6 months ago in BC Connect / Project Dashboard 0

Prevent Accidental Dealer Name Change

Problem Context When working on a project, there is the potential to click the Edit Dealer button instead of the Create Dealer button. This can cause the existing Dealer to be renamed, and affect all projects currently assigned to the customer. Id...
7 months ago in BC Connect / Projects 0 Tracked

Cut replacements for damaged pieces

Problem Context When a member is damaged in the field, and i need to send a new piece to replace it, the current process to "Save As" or create a material list, set it to "Ready For Optimization" and then pull it into a batch. This is quite involv...
8 months ago in BC Connect / Projects 0 Tracked