Skip to Main Content
Software Ideas

Welcome to the Boise Cascade Engineered Wood Products Software Ideas Portal! 

We welcome your EWP Software suggestions and ideas.

ADD A NEW IDEA

All ideas

Showing 41

Warning message for users changing joist series - change may delete hole data

Problem Context: Changing the joist series when importing a .prod material list into BC Connect may cause the joist to lose all its hole information. A warning message such as "Warning, changing joist series may cause the joist to loose it's hole ...
about 3 years ago in BC Connect / Material Lists 1 Tracked

Being able to copy a sub-folder, rename it and all the documents in the folder would copy as well into the newly named folder.

Say you have a folder named Level 2 - within the folder there are 20 manual material list. The projects Level 3 happens to be a identical to level 2. Instead of having to make all new material list or copy them individually the entire folder could...
almost 7 years ago in BC Connect / Material Lists / Other 1 Tracked

Sort on the Attachments tab hiding the trash can icon?

Use case scenario: I have a job with many attachments and need to delete some unneeded files. I sort by type and I no longer have the ability to delete. Present in Chrome, Edge, Firefox and IE.
almost 5 years ago in BC Connect / Other 1 Tracked

We need some way of exporting the Project Dashboard into an excel document

It would be extremely beneficial for us to be able to export the Project Dashboard into an excel document. This would allow the capability to create an accurate project report outside of BCConnect. Also, you could make it where you could import th...
about 5 years ago in BC Connect / Project Dashboard 1 Tracked

Price breakdown by floor in quoting tool

When using the quote tool in BC Connect there are a few things I would like to see it do. One is provide the Customer Name on the quote sheet, as it is now it puts the job name in but not the customer name. Second is it just gives a total price, I...
over 5 years ago in BC Connect / Material Lists / Other / Price Management 1 Tracked

Designer Metrics Report

As a design manager I would like to be able to show a report by the designer. One that would show the sq ft and the total dollars each designer has completed. and sort that report by year and months
almost 6 years ago in BC Connect / Reports 0 Tracked

More Sales Status Capabilities

When changing the Sales Status that it notifies the Sales Contact of any progress.
about 6 years ago in BC Connect / Other 1 Tracked

Under Inventory Quanities link additional information

From Customer Feedback If you could click on the reserved number and it would show the Batches that the Quantity is associated with. This would be useful if a batch has to be moved around in the order to be cut. It would help identify products t...
over 6 years ago in BC Connect / Inventory 0 Tracked

It would be helpful if the sub-folders made for a project carried over into the optimizer screen.

Example I have a project with a sub-folder named L2 and one named L3. Both folders consists of material list titled unit 1, unit2, and unit3. Once you go to optimizer to make batch files the sub-folders aren't listed and all you have is a list of ...
almost 7 years ago in BC Connect / Material Lists / Operations - Optimization / Other 0 Tracked

When you have a subfolder selected and create a manual material list then save - the material list would stay within the subfolder that was selected

Problem Context: Currently I create multiple sub-folders to keep multifamily projects organized by floor levels. So when I have level 2 selected and create a material list then save it instead of the list staying within the folder it just saves to...
almost 7 years ago in BC Connect / Material Lists / Other 0 Tracked